Lane reduction on 6 Street Southwest bridge
(ABC 6 News) – Repairs to planter boxes on both sides of the 6 Street Southwest bridge over Highway 52 will occur Oct. 2 to 9.
One lane will remain open for both directions during repairs. Dedicated turn lanes will be closed on the impacted sides.
Work will occur on one side of the bridge at a time, beginning on the south side on Oct. 2.
Sidewalks will be completely closed on the side where construction is occurring.
(Credit: City of Rochester)
This story has been updated with revised construction dates of Oct. 2-3